Week Five Completed Tasks
Filter Construction and Initial Testing
The paper towel was removed from the bottom of the filter, and it was sealed with rubber and a bottle cap. There is a hole in the bottle cap to allow the filtered water to drain out. The rubber hose is still not exactly attached because currently it is taped in place. The iron filings were also added on top of the fiberglass, even though they had not finished rusting. The filter was tested, but the output water ended up with more color than the input. It's predicted that the water is being colored by the fiberglass.
No comments:
Post a Comment